Skip to main content

The new underground Metro Copenhagen is being completed at full speed and all escalators are soon mounted and ready to start rolling with travellers both high and low.

Nordic Installation is here and installs some of the last street escalators, these 3 on Gammelstrand has a liftheight of 16 meters and requires both knowledge and equipment to install.

Nordic has hung up 14 remote-controlled electric winches to swing the parts in under the ground and all the way down to the lower landing and then build our way up, an exciting installation that rolls on really nice.